Brick Work — Cement mortar 1:4

All coefficients below are per 1 cum of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Major materials at a glance

Bricks & Blocks
0.4871000 Nos
Modular common burnt clay bricks of class designation 7.5

Complete analysis

Materials 1

IngredientQuantityUnit
Modular common burnt clay bricks of class designation 7.5 Bricks & Blocks 0.487 1000 Nos

Labour 4

IngredientQuantityUnit
Mason 1st class 0.33 day
Mason 2nd class 0.33 day
Coolie 1 day
Bhisti 0.18 day

Carriage 1

IngredientQuantityUnit
Carriage of Bricks 0.487 1000 Nos

Sub-Analysis (derived item) 1

IngredientQuantityUnit
[Sub-Item] 3.9 0.22 cum

Sundries & Lump Sum 1

IngredientQuantityUnit
Sundries 2.73 L.S.

Full DSR item description

Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: - Cement mortar 1:4 (1 cement : 4 coarse sand)

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.