Brick Work — Cement mortar 1:4

All coefficients below are per 1 cum of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Major materials at a glance

Bricks & Blocks
0.4941000 Nos
Common burnt clay F.P.S. (non modular) bricks class designation 7.5

Complete analysis

Materials 1

IngredientQuantityUnit
Common burnt clay F.P.S. (non modular) bricks class designation 7.5 Bricks & Blocks 0.494 1000 Nos

Labour 5

IngredientQuantityUnit
Mason 1st class 0.47 day
Mason 2nd class 0.47 day
Coolie 1.8 day
Bhisti 0.2 day
Coolie 1.13 day

Carriage 1

IngredientQuantityUnit
Carriage of Bricks 0.494 1000 Nos

Sub-Analysis (derived item) 1

IngredientQuantityUnit
[Sub-Item] 3.9 0.25 cum

Sundries & Lump Sum 2

IngredientQuantityUnit
Sundries 2.73 L.S.
Sundries 22.36 L.S.

Full DSR item description

Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : - Cement mortar 1:4 (1 cement : 4 coarse sand)

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.