Earth WorkCPWD DSR Civil 2023 · Item 2.6.1

Free to browse. Log in to unlock the full Rate Analysis of every Civil and Electrical item in the latest CPWD DSR.

Log in to QuickBOQ →

Earth Work — All kinds of soil

All coefficients below are per 10 cum of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Complete analysis

Materials 1

IngredientQuantityUnit
Hire and running charges of loader 0.08 day

Labour 2

IngredientQuantityUnit
Mate 0.04 day
Coolie 0.06 day

Machinery & Plant 1

IngredientQuantityUnit
Hydraulic Excavator (3D) with driver and fuel 0.08 day

Sundries & Lump Sum 1

IngredientQuantityUnit
Sundries 3.1 L.S.

Full DSR item description

Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. - All kinds of soil

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.

← All material coefficients|Browse CPWD DSR Civil 2023|How rate analysis works|Pricing an item not in this list|DSR vs DAR explained