Log in to QuickBOQ →All coefficients below are per 10 cum of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.
| Ingredient | Quantity | Unit |
|---|---|---|
| Rock Breaker | 2.825 | day |
| Blasting powder | 3.93 | kg |
| Blasting fuse (fuse wire) | 4 | each |
| Ingredient | Quantity | Unit |
|---|---|---|
| Beldar | 0.45 | day |
| Coolie | 0.55 | day |
| Ingredient | Quantity | Unit |
|---|---|---|
| Hydraulic Excavator (3D) with driver and fuel | 0.125 | day |
| Hire and running charges of tipper | 0.125 | day |
| Rock Excavator | 1.06 | day |
| Rock Hole Driller | 0.885 | day |
| Ingredient | Quantity | Unit |
|---|---|---|
| Sundries | 16.12 | L.S. |
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. - Hard rock (requiring blasting)
Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.