Flooring — 1:6

All coefficients below are per 10 sqm of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Major materials at a glance

Bricks & Blocks
0.5651000 Nos
Common burnt clay F.P.S. (non modular) bricks class designation 7.5
Cement
0.02tonne
Portland Cement (OPC-43 Grade)

Complete analysis

Materials 2

IngredientQuantityUnit
Common burnt clay F.P.S. (non modular) bricks class designation 7.5 Bricks & Blocks 0.565 1000 Nos
Portland Cement (OPC-43 Grade) Cement 0.02 tonne

Labour 4

IngredientQuantityUnit
Mason 2nd class 1.08 day
Beldar 0.25 day
Coolie 1.62 day
Bhisti 0.27 day

Carriage 2

IngredientQuantityUnit
Carriage of Bricks 0.565 1000 Nos
Carriage of Cement 0.02 tonne

Sub-Analysis (derived item) 1

IngredientQuantityUnit
[Sub-Item] 3.11 0.434 cum

Full DSR item description

Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: - 1:6 (1cement : 6 coarse sand)