FlooringCPWD DSR Civil 2023 · Item 11.2

Free to browse. Log in to unlock the full Rate Analysis of every Civil and Electrical item in the latest CPWD DSR.

Log in to QuickBOQ →

Flooring

All coefficients below are per 10.0001 sqm of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Major materials at a glance

Bricks & Blocks
0.6451000 Nos
Common burnt clay F.P.S. (non modular) bricks class designation 7.5
Fine Aggregate (Sand)
0.15cum
Fine sand (zone IV)

Complete analysis

Materials 2

IngredientQuantityUnit
Common burnt clay F.P.S. (non modular) bricks class designation 7.5 Bricks & Blocks 0.645 1000 Nos
Fine sand (zone IV) Fine Aggregate (Sand) 0.15 cum

Labour 3

IngredientQuantityUnit
Mason 2nd class 0.9 day
Coolie 1.98 day
Bhisti 0.05 day

Carriage 2

IngredientQuantityUnit
Carriage of Bricks 0.645 1000 Nos
Carriage of Fine sand (1 part of badarpur sand: 2 parts jamuna sand) 0.15 cum

Sub-Analysis (derived item) 1

IngredientQuantityUnit
[Sub-Item] 3.18 0.15 cum

Full DSR item description

Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.