PaintingCPWD DSR Civil 2023 · Item 13.44.1

Painting — New work

Analysed rate
₹94.50per Unit
CPWD analyses this item over 10 Unit; the batch total is ₹945.01.

All coefficients below are per 10 Unit of finished work. This is the complete analysis for the item — every material, labour trade, machine, carriage line and sub-analysis it consumes.

Major materials at a glance

Paint & Finishes
3.84kg
Water proofing cement paint

Complete analysis

Materials 1

IngredientCoefficientUnitRate (₹)Amount (₹)
Water proofing cement paint Paint & Finishes 3.84 kg 41.00 157.44

Labour 3

IngredientCoefficientUnitRate (₹)Amount (₹)
Painter 0.46 day 816.00 375.36
Coolie 0.23 day 736.00 169.28
Bhisti 0.1 day 816.00 81.60

Sundries & Lump Sum 3

IngredientCoefficientUnitRate (₹)Amount (₹)
Carriage 1.56 L.S. 2.27 3.54
Sundries 7.15 L.S. 2.27 16.23
Sundries 8.06 L.S. 2.27 18.30

Analysed rate

Sub-total (materials, labour, machinery, sundries)₹821.75
Add contractor's profit & overheads @ 15%₹123.26
Analysed rate for the full 10 Unit batch₹945.01
Rate per Unit₹94.50

Full DSR item description

Finishing walls with water proofing cement paint of required shade : - New work (Two or more coats applied @ 3.84 kg/10 sqm)

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.