Painting — New work

All coefficients below are per 10 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Major materials at a glance

Paint & Finishes
3.84kg
Water proofing cement paint

Complete analysis

Materials 1

IngredientQuantityUnit
Water proofing cement paint Paint & Finishes 3.84 kg

Labour 3

IngredientQuantityUnit
Painter 0.46 day
Coolie 0.23 day
Bhisti 0.1 day

Sundries & Lump Sum 3

IngredientQuantityUnit
Carriage 1.56 L.S.
Sundries 7.15 L.S.
Sundries 8.06 L.S.

Full DSR item description

Finishing walls with water proofing cement paint of required shade : - New work (Two or more coats applied @ 3.84 kg/10 sqm)

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.