Free to browse. Log in to unlock the full Rate Analysis of every Civil and Electrical item in the latest CPWD DSR.
Log in to QuickBOQ →All coefficients below are per 10 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.
| Ingredient | Quantity | Unit |
|---|---|---|
| Water thinnable cement primer for interior wall surface, having VOC content less than 50 grams/ litre Cement | 0.7 | litre |
| Acrylic distemper 1st quality , having VOC content less than 50 grams/ litre Paint & Finishes | 1.25 | Kg |
| Ingredient | Quantity | Unit |
|---|---|---|
| Painter | 1 | day |
| Coolie | 0.5 | day |
| Ingredient | Quantity | Unit |
|---|---|---|
| Carriage and sundries | 8.06 | L.S. |
| Carriage and sundries | 8.06 | L.S. |
Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : - New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre
Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.
← All material coefficients|Browse CPWD DSR Civil 2023|How rate analysis works|Pricing an item not in this list|DSR vs DAR explained