Plain Cement Concrete (PCC)CPWD DSR Civil 2023 · Item 4.1.5B

PCC — 1:3:6 — All work up to plinth level

Analysed rate
₹4,559.04per cum

All coefficients below are per 1 cum of finished work. This is the complete analysis for the item — every material, labour trade, machine, carriage line and sub-analysis it consumes.

Major materials at a glance

Coarse Aggregate
0.7cum
Recycled Aggregate (RA) 20 mm nominal size
Coarse Aggregate
0.24cum
Recycled Aggregate (RA) 10 mm nominal size
Coarse Aggregate
0.47cum
Manufactured sand derived from Recycled Concrete Aggregate (RCA)
Cement
0.22tonne
Portland Cement (OPC-43 Grade)

Complete analysis

Materials 4

IngredientCoefficientUnitRate (₹)Amount (₹)
Recycled Aggregate (RA) 20 mm nominal size Coarse Aggregate 0.7 cum 420.00 294.00
Recycled Aggregate (RA) 10 mm nominal size Coarse Aggregate 0.24 cum 450.00 108.00
Manufactured sand derived from Recycled Concrete Aggregate (RCA) Coarse Aggregate 0.47 cum 957.00 449.79
Portland Cement (OPC-43 Grade) Cement 0.22 tonne 5,156.00 1,134.32

Labour 3

IngredientCoefficientUnitRate (₹)Amount (₹)
Mason (average) 0.1 day 857.00 85.70
Beldar 1.63 day 736.00 1,199.68
Bhisti 0.7 day 816.00 571.20

Machinery & Plant 2

IngredientCoefficientUnitRate (₹)Amount (₹)
Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper 0.07 day 900.00 63.00
Vibrator (Needle type 40 mm) 0.07 day 400.00 28.00

Carriage 3

IngredientCoefficientUnitRate (₹)Amount (₹)
Carriage of Stone aggregate below 40 mm nominal size 0.94 cum lead-dependent
Carriage of Coarse sand 0.47 cum lead-dependent
Carriage of Cement 0.22 tonne lead-dependent

Sundries & Lump Sum 1

IngredientCoefficientUnitRate (₹)Amount (₹)
Sundries 13.52 L.S. 2.27 30.69

Analysed rate

Sub-total (materials, labour, machinery, sundries)₹3,964.38
Add contractor's profit & overheads @ 15%₹594.66
Analysed rate per cum₹4,559.04

3 carriage lines are excluded from this total. CPWD leaves carriage rates blank because they depend on lead distance and station, so they must be priced locally and added. The analysed rate above is therefore the works cost before carriage, not a complete tender rate.

Full DSR item description

Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : - 1:3:6 (1 cement : 3 manufactured sand derived from Recycled concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size Recycled Aggregate (RA) )

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.