CPWD analyses this item over 91.8 cum; the batch total is ₹8,05,368.94.
All coefficients below are per 91.8 cum of finished work. This is the complete analysis for the item — every material, labour trade, machine, carriage line and sub-analysis it consumes.
Major materials at a glance
Coarse Aggregate
52.326cum
Stone Aggregate (Single size) : 20 mm nominal size
Coarse Aggregate
25.704cum
Stone Aggregate (Single size) : 10 mm nominal size
Fine Aggregate (Sand)
39.015cum
Coarse sand (zone III)
Cement
36.72tonne
Portland Cement (OPC-43 Grade)
Complete analysis
Materials 4
Ingredient
Coefficient
Unit
Rate (₹)
Amount (₹)
Stone Aggregate (Single size) : 20 mm nominal size Coarse Aggregate
52.326
cum
1,425.00
74,564.55
Stone Aggregate (Single size) : 10 mm nominal size Coarse Aggregate
25.704
cum
1,400.00
35,985.60
Coarse sand (zone III) Fine Aggregate (Sand)
39.015
cum
1,450.00
56,571.75
Portland Cement (OPC-43 Grade) Cement
36.72
tonne
5,156.00
1,89,328.32
Labour 6
Ingredient
Coefficient
Unit
Rate (₹)
Amount (₹)
Beldar
112.9
day
736.00
83,094.40
Coolie
75.3
day
736.00
55,420.80
Bhisti
82.6
day
816.00
67,401.60
Mason 1st class
9.2
day
897.00
8,252.40
Mason 2nd class
9.2
day
816.00
7,507.20
Coolie
137.7
day
736.00
1,01,347.20
Machinery & Plant 2
Ingredient
Coefficient
Unit
Rate (₹)
Amount (₹)
Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper
6.4
day
900.00
5,760.00
Vibrator (Needle type 40 mm)
6.4
day
400.00
2,560.00
Carriage 3
Ingredient
Coefficient
Unit
Rate (₹)
Amount (₹)
Carriage of Stone aggregate below 40 mm nominal size
3 carriage lines are excluded from this total. CPWD leaves carriage rates blank because they depend on lead distance and station, so they must be priced locally and added. The analysed rate above is therefore the works cost before carriage, not a complete tender rate.
Full DSR item description
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : - 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.