Shuttering — Columns, Pillars, Piers, Abutments, Posts and Struts

All coefficients below are per 45 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Complete analysis

Materials 4

IngredientQuantityUnit
Wall form panel 1250x450 mm 1.7 each
Corner angle 45x45x5 mm 2.50 m long 0.85 each
Column clamp 450x1070 mm 1.063 each
Prop 2 m ( 2-3.5 m) 0.85 each

Labour 2

IngredientQuantityUnit
Fitter (grade 1) 10 day
Beldar 20 day

Sundries & Lump Sum 4

IngredientQuantityUnit
Sundries 276.2 L.S.
Carriage 520 L.S.
Sundries 390 L.S.
Carriage 260 L.S.

Full DSR item description

Centering and shuttering including strutting, propping etc. and removal of form for - Columns, Pillars, Piers, Abutments, Posts and Struts

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.

← All material coefficients|Browse CPWD DSR Civil 2023|How rate analysis works|Pricing an item not in this list|DSR vs DAR explained