Shuttering — Foundations, footings, bases of columns, etc. for mass

All coefficients below are per 10 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Complete analysis

Materials 6

IngredientQuantityUnit
Wall form panel 1250x500 mm 0.34 each
Corner angle 45x45x5 mm 1.50 m long 0.085 each
100 mm channel shoulder 2.5 m long 0.17 each
Double clip (bridge clip) 0.34 each
Single clip 0.17 each
M.S. tube 40 mm dia 0.213 metre

Labour 2

IngredientQuantityUnit
Fitter (grade 1) 0.75 day
Beldar 1.5 day

Sundries & Lump Sum 4

IngredientQuantityUnit
Sundries 22.1 L.S.
Carriage 78 L.S.
Sundries 52 L.S.
Sundries 26 L.S.

Full DSR item description

Centering and shuttering including strutting, propping etc. and removal of form for - Foundations, footings, bases of columns, etc. for mass concrete

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.