Log in to QuickBOQ →All coefficients below are per 10 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.
| Ingredient | Quantity | Unit |
|---|---|---|
| Wall form panel 1250x500 mm | 0.34 | each |
| Corner angle 45x45x5 mm 1.50 m long | 0.085 | each |
| 100 mm channel shoulder 2.5 m long | 0.17 | each |
| Double clip (bridge clip) | 0.34 | each |
| Single clip | 0.17 | each |
| M.S. tube 40 mm dia | 0.213 | metre |
| Ingredient | Quantity | Unit |
|---|---|---|
| Fitter (grade 1) | 0.75 | day |
| Beldar | 1.5 | day |
| Ingredient | Quantity | Unit |
|---|---|---|
| Sundries | 22.1 | L.S. |
| Carriage | 78 | L.S. |
| Sundries | 52 | L.S. |
| Sundries | 26 | L.S. |
Centering and shuttering including strutting, propping etc. and removal of form for - Foundations, footings, bases of columns, etc. for mass concrete
Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.