Centering & ShutteringCPWD DSR Civil 2023 · Item 5.9.2

Free to browse. Log in to unlock the full Rate Analysis of every Civil and Electrical item in the latest CPWD DSR.

Log in to QuickBOQ →

Shuttering — Walls including attached pilasters, butteresses,

All coefficients below are per 15 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.

Complete analysis

Materials 5

IngredientQuantityUnit
Wall form panel 1250x500 mm 0.51 each
100 mm channel shoulder 2.5 m long 0.13 each
Double clip (bridge clip) 0.51 each
Single clip 0.255 each
M.S. tube 40 mm dia 0.68 metre

Labour 2

IngredientQuantityUnit
Fitter (grade 1) 3.5 day
Beldar 6 day

Sundries & Lump Sum 4

IngredientQuantityUnit
Sundries 27.62 L.S.
Carriage 78 L.S.
Sundries 78 L.S.
Sundries 52 L.S.

Full DSR item description

Centering and shuttering including strutting, propping etc. and removal of form for - Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.

← All material coefficients|Browse CPWD DSR Civil 2023|How rate analysis works|Pricing an item not in this list|DSR vs DAR explained