Free to browse. Log in to unlock the full Rate Analysis of every Civil and Electrical item in the latest CPWD DSR.
Log in to QuickBOQ →All coefficients below are per 0.036 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.
| Ingredient | Quantity | Unit |
|---|---|---|
| Laminated veneer lumber confirming to TADS 15:1995 manufactured in factory in frames of doors, windows | 3.8 | 10 cudm |
| Ingredient | Quantity | Unit |
|---|---|---|
| Carpenter 1st class | 0.2 | day |
| Carpenter 2nd class | 0.2 | day |
| Beldar | 0.2 | day |
| Ingredient | Quantity | Unit |
|---|---|---|
| Carriage of Timber | 0.038 | cum |
Providing laminated veneer lumber conforming to IS:14616 and TAD -15: 2001 (Part B) in factory made frames of doors, windows, clerestory windows and other frames, wrought framed and fixing in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).
Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.
← All material coefficients|Browse CPWD DSR Civil 2023|How rate analysis works|Pricing an item not in this list|DSR vs DAR explained