Log in to QuickBOQ →All coefficients below are per 0.036 Unit of finished work — every material, labour trade, machine, carriage line and sub-analysis this item consumes, exactly as CPWD lists them.
| Ingredient | Quantity | Unit |
|---|---|---|
| Second class teak wood in scantling Timber | 3.8 | 10 cudm |
| Ingredient | Quantity | Unit |
|---|---|---|
| Carpenter (average) | 0.72 | day |
| Beldar | 0.07 | day |
| Ingredient | Quantity | Unit |
|---|---|---|
| Carriage of Timber | 0.038 | cum |
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). - Second class teak wood
Coefficients are taken from the CPWD analysis of rates for DSR Civil 2023. Basic rates are revised by cost index and correction slips, so multiply these quantities by current market rates rather than assuming a published rate is still live.