Dismantling and Demolishing — CPWD Civil DSR 2023

92 items in this chapter. Click any item for its full description, unit and rate.

15.1 Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in-charge cum ₹851.50
15.2
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer
15.3 Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer — in- charge. cum ₹3551.25 15.4 Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge. cum ₹3177.25 15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. sqm ₹1147.20 15.6 Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. kg ₹9.05
15.7
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..
15.8
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured)
15.9
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
15.10
Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
15.11
Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured)
15.12
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead
15.13
Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead
15.14
Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead
15.15
Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one metre or part thereof beyond 10 metres
15.16
Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres
15.17
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in
15.18 Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. kg ₹5.65 15.19 Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge kg ₹3.85 15.20 Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metres kg per metre span ₹0.85 15.21 Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres. kg per metre height ₹0.85 15.22 Extra for marking of structural steel work required to be re-erected. kg ₹4.65
15.23
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead cum ₹1317.65 15.25 Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead Sqm ₹266.45 15.26 Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. Sqm ₹105.35 15.27 Demolishing mud phaska in terracing and disposal of material within 50 metres lead. . cum ₹914.30
15.28
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of
15.29 Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. cum ₹2664.65 15.30 Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. sqm ₹253.90 15.31 Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. Sqm ₹209.90 15.32 Demolishing thatch roofing including mats, bamboo, jaffari etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. Sqm ₹57.70 15.33 Dismantling wooden ballies in posts and struts including stacking within 50 metres lead. m ₹20.95
15.34
Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of
15.35 Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres lead. No. ₹13.45 15.36 Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. Kg ₹36.80 15.37 Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres lead.. Sqm ₹64.85 15.38 Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres lead. sqm ₹75.80
15.39
Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50metres lead
15.40
Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead
15.41 Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead. Sqm ₹56.35
15.42
Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead
15.43
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
15.44
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge
15.45
Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge
15.46
Dismantling steel cylinder R.C. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in-charge
15.47
Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge
15.48 Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge. man ₹697.40 15.49 Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge. each ₹406.75 15.50 Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 metres lead. each ₹4623.70 15.51 Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50metres lead including refilling the excavated gap. each ₹958.75 15.52 Dismantling of flushing cistern of all types (C.I./PVC/Vitreous China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. each ₹112.05
15.53
Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metres
15.54 Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres lead. No. ₹726.35
15.55
Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead
15.56 Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. Sqm ₹54.65 15.57 Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. Sqm ₹56.35 15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. cum ₹2818.90 15.59 Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. cum ₹420.80 15.60 Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. cum ₹263.95