7.1
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with
7.2
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at window sills, ceiling level and the like.
7.5 Extra for random rubble masonry with hard stone curved on plan for a mean radius not exceeding 6 m. cum ₹1046.20
7.6
Coursed rubble masonry (first sort) with hard stone in foundation and plinth with
7.7
Coursed rubble masonry (second sort) with hard stone in foundation & plinth with
7.10
Extra for coursed rubble masonry with hard stone (first or second sort) in
7.11 Extra for coursed rubble masonry with hard stone (first or second sort) curved on plan for a mean radius not exceeding 6 m. cum ₹1133.65
7.12
Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade
7.13
Stone work plain ashlar in arches in super structure upto floor V level in cement mortar 1:3 (1 cement : 3 coarse sand) including centring, shuttering and pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade.
7.14
Stone work plain ashlar in domes, in super structure upto floor V level in cement mortar 1:3 (1 cement : 3 coarse sand) including centring, shuttering and pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade.
7.15
Stone work ashlar punched (ordinary) in superstructure upto floor five level in cement mortar 1:6 (1 white cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade.
7.16 for Extra stone work, random rubble / coursed rubble masonry / ashlar masonry above floor V level for every four floors or part thereof by mechnical means. cum ₹169.45
7.17
Extra for plain ashlar or ashlar punched in
7.18 Extra for stone work; plain ashlar or ashlar punched curved on plan with a mean radius not exceeding 6 m. cum ₹2014.00 7.19 Extra for additional cost of centering for arches exceeding 6m span including all strutting, bolting, wedging etc. and removal (area of soffit to be measured). sqm ₹608.15
7.20
Stone work ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade
7.21
Extra for stone work ashlar sunk or moulded or sunk and moulded or carved in
7.22 Extra for stone work ashlar sunk or moulded in cornices. units ₹303.50 7.24 Extra for stone work (veneer work) curved on plan with a mean radius not exceeding 6 m. cum ₹2896.00 7.26 Providing and fixing stone dowels 10x5x2.50 cm cut to double wedge shape as per design in cement mortar 1:2 (1 cement : 2 coarse sand) including making the necessary chases. dowel ₹54.55
7.28
Providing and fixing sloping chajja of stone 40 mm thick and upto 80 cm wide beyond the wall as measured along the slope in cement mortar 1:4 (1 cement : 4 coarse sand) with 12mm diameter anchoring steel bar 45 cm long fixed in each stone and supported on and including with bricks cove in cement mortar 1:4 (1 cement : 4 coarse sand) including pointing in cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade
7.29
Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm projection in cement mortar 1:4 (1 cement : 4 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade
7.30 30mm red sand stone sun-shade (chisel-dressed) supported on red sand stone brackets, fixed in walls with cement mortar 1:4 (1 cement : 4 coarse sand) including finishing complete. Sqm ₹2159.90 7.31 Providing and fixing red sand stone brackets 55x22.5x45cm sunk and moulded including providing and fixing with 4 Nos. gun metal cramp 25x6mm 30 cm long and dowel bars 7.5 cm long 6 mm dia as per design. bracket ₹6788.85
7.32
Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade.
7.33
Providing and fixing stone jali 40mm thick throughout in cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc.
7.34 Extra for laying stone work in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc., complete. (NOTE:-The quantity will be calculated by multiplying the depth measured from sub-soil water level upto the centre of gravity of stone work under sub-water with the quantity of stone work in cum executed under the sub-soil water. The depth of centre of gravity shall be reckoned correct to 0.1m 0.05m or more shall be taken as 0.1m and less than 0.05m ignored). cum ₹1098.80 7.35 Extra for laying stone work in or under foul position. cum ₹467.55
7.38
Stone tile work for wall lining upto 10 m height with special adhesive over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement with an admixture of pigment to match the stone shade.