Free to browse. Log in to unlock the full Rate Analysis of every Civil and Electrical item in the latest CPWD DSR.

Log in to QuickBOQ →

Lighting Controls — CPWD Electrical DSR 2025

6 items in this chapter. Click any item for its full description, unit and rate.

7.1 Supplying, Installation, Testing and commissioning of Passive Infrared (PIR) technology based occupancy sensor having high performance, non regulating programmable type, suitable for connected load upto 10Amp, for mounting height up to 3 meter and for 5 m diameter coverage area along with necessary fixing arrangements i/c programming at site etc. complete as required. — COST FOR 1 nos. Each ₹4896.00 7.2 Supplying, Installation, Testing and commissioning of Passive Infrared(PIR) technology based occupancy sensor with day light dimming(lighting level shall be regulated as per availability of natural day light in an area along with occupancy detection.) having high performance, regulating programmable type, suitable for connected load upto 10Amp , for mounting height up to 3 mtr and for 5 m diameter coverage area along with necessary fixing arrangements i/c programming at site etc. complete as required. — COST FOR 1 nos. Each ₹9670.00 7.3 Supplying, Installation, Testing and commissioning of Microwave technology based occupancy sensor having high performance, non regulating programmable type, suitable for connected load upto 10Amp , for mounting height up to 3 meter and for 5m X 20m coverage area along with necessary fixing arrangements i/c programming at site etc. complete as required. — COST FOR 1 nos. Each ₹12515.00
7.4
Supplying, Installation, Testing and commissioning of Astronomical time switch of following configuration to be mounted in feeder pillars / Lighting DBs for automatic switching On & OFF of street lights at sun Each & sun rise or twilight(Auto ON, Auto OFF, Auto modes) with manual override facility with 12/24 hour display format with suitable battery and indication for relay status i/c programming at site complete as required.

Want the rate build-up rather than just the rate? Browse material coefficient analyses, or read DSR vs DAR, explained.