Free to browse. Log in to unlock the full Rate Analysis of every Civil and Electrical item in the latest CPWD DSR.

Log in to QuickBOQ →

Pole Erection — CPWD Electrical DSR 2025

13 items in this chapter. Click any item for its full description, unit and rate.

12.1
Erection of RCC/ PCC pole of following length in brick ballast and ramming the foundation, finishing with 150mm thick cement concrete (1:3:6) layer on top with including excavation and refilling etc as required.
12.2 Erection of RCC/ PCC pole strut in brick ballast and ramming the foundation including excavation and refilling and secured with holding clamps, bolts, nuts, etc. as required. — Details of cost for one No Each ₹11859.00
12.3
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required.
12.4 Erection of steel tubular or rail pole strut in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling and secured with holding clamps, bolts, nuts, etc. as required. — Details of cost for one No Each ₹10363.00 12.5 Providing and making steel pole collar with cement concrete (1 cement: 3 coarse sand: 6 stone aggregate 20mm) of specified size and shape including form work, plastering if required, curing etc as required. (volume of pole/ pipe not to be deducted) — Details of cost for 1 cum cum ₹9096.00
12.6
Supplying and embedding following dia G.I. pipe (medium class) in pole collar/ foundation (during casting) for cable entry including bending the pipe to the required shape complete as required.

Want the rate build-up rather than just the rate? Browse material coefficient analyses, or read DSR vs DAR, explained.