₹31.82 per metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in- Charge.
Build a BOQ with Ladakh SoR rates · All items in Road Work