₹94.80 per metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials into municipal dumps:
300 mm diameter
Build a BOQ with Ladakh SoR rates · All items in Drainage