Ladakh SoR 2024 Item 19.6.7

₹2,335.60 per metre

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :
600 mm dia. R.C.C. pipe

Build a BOQ with Ladakh SoR rates · All items in Drainage

Related items

19.6.1100 mm dia. R.C.C. pipe₹727.40 / metre19.6.2150mm dia. R.C.C. pipe₹678.88 / metre19.6.3250 mm dia. R.C.C. pipe₹923.44 / metre19.6.4300 mm dia. R.C.C. pipe₹1,038.08 / metre19.6.5450 mm dia. R.C.C. pipe₹1,690.28 / metre19.6.6500 mm dia. R.C.C. pipe₹2,008.09 / metre19.6.8700 mm dia. R.C.C. pipe₹3,179.38 / metre19.6.9800 mm dia. R.C.C. pipe₹3,660.04 / metre19.6.10900 mm dia. R.C.C. pipe₹5,024.77 / metre19.6.111000 mm dia. R.C.C. pipe₹5,800.70 / metre19.6.121100 mm dia. R.C.C. pipe₹6,509.21 / metre19.6.131200 mm dia. R.C.C. pipe₹7,299.92 / metre