₹947.22 per Metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil
Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm
Build a BOQ with Ladakh SoR rates · All items in Earthwork