₹2,032.07 per Metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m :
Hard rock (blasting prohibited)
Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia