₹347.24 per Sqm
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered).
Depth exceeding 3 m but not exceeding 4.5 m
Build a BOQ with Ladakh SoR rates · All items in Earthwork