Ladakh SoR 2024 Item 2.3.1

₹535.50 per Cum

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m :
All kinds of soil