₹342.79 per Each
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m.
Hard rock (requiring blasting)
Build a BOQ with Ladakh SoR rates · All items in Earthwork