Ladakh SoR 2024 Item 2.33.3

₹8,920.32 per Each

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
Beyond 120 cm girth upto and including 240 cm girth

Build a BOQ with Ladakh SoR rates · All items in Earthwork

Related items