Ladakh SoR 2024 Item 21.8.1

₹128.92 per metre

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete.
Upto 5mm depth and 5 mm width

Build a BOQ with Ladakh SoR rates · All items in Aluminium Work