₹128.92 per metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete.
Upto 5mm depth and 5 mm width
Build a BOQ with Ladakh SoR rates · All items in Aluminium Work