Home / Ladakh SoR 2024 / Chapter 23 — River And Canal Protection Work / Item 23.4

Ladakh SoR 2024 Item 23.4

₹1,847.65 per cum

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

Build a BOQ with Ladakh SoR rates · All items in River And Canal Protection Work

Related items

23.3Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost…₹1,763.49 / cum23.6Hand-packing stones in wire-crates/ gabions; excluding cost of crates and stones₹528.66 / cum23.6AExtra for every additional lift of 1.5 Mtr or part there of beyond 1.5 mtr height for Hand-packing stones in…₹104.36 / cum23.12Grouting of riprap with dry aggregates, excluding cost of aggregates.₹110.41 / sqm23.13Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and…₹118.80 / sqm23.14Opening out old wire crates those and re-binding after filling.₹45.45 / sqm23.15Tipping stone-filled wire crates in position; including equipment charges₹315.12 / cum23.16Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and…₹17.98 / Per bag23.17Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m₹13.74 / Per bag23.18Loading sand / earth filled bags in boats; lead upto 50m₹10.50 / per bag