₹1,017.91 per each
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
Holes 1.2 m dia and 1.2 m deep.