Ladakh SoR 2024 Item 29.19.1.1

₹58,791.50 per metre

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Edging with bricks laid dry length wise including excavation, refilling, consolidating with hand packing and spreading neatly surplus earth within a lead of 50 m :
75 class designation.
F.P.S. Bricks

Build a BOQ with Ladakh SoR rates · All items in Horticulture And Land Scaping