₹15.27 per metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Edging with bricks laid dry length wise including excavation, refilling, consolidating with hand packing and spreading neatly surplus earth within a lead of 50 m :
50 designation.
F.P.S. bricks.
Build a BOQ with Ladakh SoR rates · All items in Horticulture And Land Scaping