Ladakh SoR 2024 Item 31.74.4

₹1,308.54 per Cum

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Fabrication and manufacturing of solid precast concrete element with provisions of shearkeys, connecting loops, dowel tubes and proper lifting accessories for walls, beams, slabs,stairs, column etc, of various thickness, shape and size of different concrete gradesmanufactured in controlled factory environment with approved methodology includingmoulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beammoulds, column moulds, staircase moulds, Facade mould, etc.), mixing, transporting andplacing of concrete, vibrating, curing, finishing, making necessary cutout/holes of requiredsizes for services, yard handling & stacking all complete as per IS 11447:1985 and as perapproved shop drawings and design mix as per the direction of Engineer-in-Charge (Cost ofreinforcement, Mechanical, Electrical and Plumbing inserts will be paid separately).
Extra for using M-60 (Cement content 440 kg) instead of M-36

Build a BOQ with Ladakh SoR rates · All items in New Technologies & Materials

Related items