Ladakh SoR 2024 Item 32.3.1

₹7,483.09 per Cum

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Providing and laying in position rammed earth in walls (Upto floor One level )
Providing and laying in position stabilized rammed earth with 8% cement in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work up to floor one level.