₹6,541.77 per Cum
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Providing and laying in position rammed earth in walls (above floor two level upto floor five level)
Providing and laying in position rammed earth in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work above floor two level upto floor five level.
Build a BOQ with Ladakh SoR rates · All items in Special Items For Ladakh