Home / Ladakh SoR 2024 / Chapter 28 — Conservation Of Heritage Buildings

Ladakh SoR 2024: Chapter 28 — Conservation Of Heritage Buildings

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

28.1Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means,…₹58.97 / sqm 28.2Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above…₹330.21 / sqm 28.3leaning the sand stone surface and removing dirt, dust, bird dropping, grease, oil, algae, fungus, monkey beats, vegetable growth etc.,…₹194.84 / sqm 28.4Providing and applying antifungal wash treatment using 3% solution of sodium pentachlorophenate, of reputed brand and manufacturer, on…₹74.33 / sqm 28.5Ruled / Flush pointing on Red sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {One lime: 1.5…₹341.64 / sqm 28.6Ruled/ Flush pointing on White sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {One lime :…₹341.64 / sqm 28.7Applying two or more coat of Ethyl Silicate chemical as approved by Archaeological Survey of India/ Engineer-in-charge, of approved brand…₹325.91 / sqm 28.8Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/…₹118.60 / sqm