₹246.23 per each
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Cleaning and desilting of gully trap chamber, including removal of rubbish mixed with earth etc. and disposal of same, all as per the direction of Engineer-incharge
Build a BOQ with Ladakh SoR rates · All items in Repairs To Building