₹379.17 per each
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level as per direction of Engineer-in-charge.
Build a BOQ with Ladakh SoR rates · All items in Repairs To Building