₹139.81 per metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge :
15 mm to 40 mm nominal bore
Build a BOQ with Ladakh SoR rates · All items in Dismentling And Demolishing