₹630.58 per metre
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge:
Above 300 mm diametre