₹1,067.96 per each
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metres
Above 150 mm diametre
Build a BOQ with Ladakh SoR rates · All items in Dismentling And Demolishing