₹155.12 per Sqm
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):
Depth not exceeding 1.5 m
Build a BOQ with Ladakh SoR rates · All items in Earthwork