Ladakh SoR 2024 Item 2.20.3

₹178.13 per Sqm

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Open timbering in trenches including strutting and shoring complete (measurements to be taken of the face area timbered):
Depth exceeding 3 m but not exceeding 4.5 m

Build a BOQ with Ladakh SoR rates · All items in Earthwork

Related items