₹329.46 per cum
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
Build a BOQ with Ladakh SoR rates · All items in Slip Clearance