Home / Ladakh SoR 2024 / Chapter 26 — Slip Clearance / Item 26.5

Ladakh SoR 2024 Item 26.5

₹734.98 per cum

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

In hard rocks; by blasting

Build a BOQ with Ladakh SoR rates · All items in Slip Clearance

Related items

26.1In ordinary soils disposal lead upto 50 m and lift upto 1.5 m₹161.20 / cum26.2In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.₹329.46 / cum26.3In soils; mixed with Decomposed Rocks; by blasting or any other means₹464.30 / cum26.4In medium hard rocks ; by blasting₹520.45 / cum