₹21.16 per cum
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Filling mixture of earth and sludge or manure in the desired proportion in trenches, flooding with water and levelling (cost of supplying earth and sludge or manure and mixing excluded).
Build a BOQ with Ladakh SoR rates · All items in Horticulture And Land Scaping