₹592.53 per cum
Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.
Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material lead upto 50 m and lift upto 1.5 m disposed material to be neatly dressed.
Build a BOQ with Ladakh SoR rates · All items in Horticulture And Land Scaping