Ladakh SoR 2024 Item 31.77.1

₹203.75 per Sqm

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Erection & Installation of Precast/Prestressed Concrete elements in correct & final positionwith proper line level and plumb at site making all arrangements (i.e cranes, push-pulljacks & all another T & P for lifting Placing & Alignment of elements, within erectiontolerance as per IS 15916 as per approved shop drawings and all complete as per thedirection of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout andsteel works i.e hangers. All work up to fifth floor
Prestressed hollow core Slab up to 200 mm thickness

Build a BOQ with Ladakh SoR rates · All items in New Technologies & Materials