Ladakh SoR 2024 Item 31.77.3

₹2,758.37 per Cum

Rates include GST and contractor’s profit & overheads (15%), effective 01-08-2024.

Description

Erection & Installation of Precast/Prestressed Concrete elements in correct & final positionwith proper line level and plumb at site making all arrangements (i.e cranes, push-pulljacks & all another T & P for lifting Placing & Alignment of elements, within erectiontolerance as per IS 15916 as per approved shop drawings and all complete as per thedirection of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout andsteel works i.e hangers. All work up to fifth floor
Solid concrete wall elements